Lithuania, Klaipeda
Construction of marine logistics terminal
Several kilometres of SN8 pipes ID300, ID500, ID600, ID800 and ID1200 all with electro-fusion connection. Manholes with electro-fusion connection to all of these pipes. Stormwater tanks ID1200 and pumping stations. Oil separators for 4, 25, 50, 90, 100 and 120 l/s. Project requirement was that all the materials have to hold traffic load F900 (90 tons).